DirektlyDirektlyDocumentation
Browse guides
Manage

Saving, versions and recovery

Saved means persisted

Changes pass through the project’s revision-checked save queue. Wait for the saved state before closing a project with an outstanding edit. If saving fails, the error needs attention.

Undo and redo

Control/Command+Z undoes a saved change; Shift+Control/Command+Z redoes it. Related grouping and duplication work is saved as a single action.

Look back safely

Open Revision history to inspect an earlier version. Return to latest before editing. Restoring an earlier revision creates a new saved revision, keeping the previous state in history.

Conflicting changes

If another session changed the project, read the latest saved version and retry deliberately. Do not overwrite a newer revision with a stale assumption.